Energy nomenclature

flex-pse uses one project wide naming standard for a unit’s energy draw, so plant aggregation and costing can find every unit’s contribution by name. The canonical names live as constants in flexcore.nomenclature. A typo becomes an import error instead of a silently unaggregated variable.

Name

Meaning

Units

Consumer

POWER_ELECTRICAL (power_electrical[t])

electrical draw of one unit (motor/drive)

kW

FlexCosting → EECO (energy, demand charges, DR) and plant aggregation

POWER_THERMAL (power_thermal[t])

heat or gas driven duty of one unit

kW

separate thermal aggregation/costing

FUEL_USAGE (fuel_usage_<fuel>[t])

combustible fuel consumption of one unit

m³/hr

FlexCosting → EECO’s gas leg

Rules:

  • Every unit model registers at least one power draw, through register_power() or by creating one with declare_power().

  • Both power quantities are powers in kW, despite the domain word “energy.” FlexCosting aggregates them into a kW time series and hands the electrical one to EECO, both in the model (objective) and as a numpy array after the solve (reporting). EECO derives kWh internally from the time step.

  • Never introduce a variable named bare power, energy, or work. Always use the flexcore.nomenclature constants. A literal name string anywhere else blocks review.

  • Storage units (for example BatteryModel) sign POWER_ELECTRICAL from the storage device’s own frame. Charging is positive, discharging is negative (an export). This matches the general draw convention above. Charging is a draw, discharging offsets it, and plant aggregation stays a plain sum with no per unit sign flipping.

  • A unit that generates rather than stores follows the same export convention. Combustor signs POWER_ELECTRICAL negative (upper bounded at 0), so a combustor’s output nets against plant load exactly the way a discharging battery does, again with no per unit sign flipping at the plant level.

  • A generating unit whose relation is swappable splits the magnitude from the sign. Combustor carries power_generated[t], the generation magnitude, bounded below at 0, and ties it to the draw through the constraint power_electrical_sign[t]. Only the magnitude relation is registered, so a surrogate swap can never replace the sign constraint, and the sign survives a fit that no expression check could have vouched for. Nothing can prove an arbitrary fitted body stays non positive over the feasible region, but a body feeding a target bounded below at 0 either respects the convention or violates a bound that names it directly. It also means a generation surrogate gets fitted in magnitude space, positive, the way generation data is normally logged. That’s why power_generated, not power_electrical, is the unit’s registered IO output.

  • Curtailment sits between the magnitude and the sign. GenericRenewables treats power_generated as available output. An unregistered curtailment_balance[t] subtracts the non-negative power_curtailed[t] to give power_delivered[t], and the sign constraint negates that. A surrogate swap therefore can’t remove curtailment, and the fitted relationship should be trained on availability data (irradiance, wind speed), not metered output that was already curtailed. Curtailment carries no cost, so when the marginal price of export is exactly zero, how much gets curtailed is arbitrary. The optimizer is indifferent between exporting and spilling.

Fuel is a volume, not a power

A combustible fuel gets metered and billed on volume, so FUEL_USAGE is a volumetric flow in m³/hr, and deliberately not a PowerKind. A unit that burns fuel registers that flow with register_fuel_usage(). For a stream built from SimpleGasFlow, whose flow_vol_phase is already m³/hr, that’s a Reference to the stream’s flow. FlexCosting sums every registered flow into aggregate_fuel_usage[t, fuel] and hands that volume series to EECO’s gas leg.

flex-pse applies no heating value anywhere. If a tariff prices gas on an energy basis, converting volume to energy is EECO’s job. It applies its own fuel heating value assumption. Don’t model a fuel as a kW power_thermal duty and convert it back. A heat duty is a different quantity from metered fuel volume, and it isn’t the fuel cost input.

The team agreed on these names to clear up the “work vs. power” inconsistencies in IDAES/WaterTAP. The exact words may still change, which is why they all live in one constants module.