Degradation penalties¶
Flexible operation wears equipment. A pump that follows a volatile tariff
cycles its speed, a reverse osmosis train that load-shifts swings its feed
pressure, and a battery that arbitrages cycles its state of charge. A
schedule that ignores that wear looks cheaper than it is.
add_degradation() attaches a priced wear penalty to
a unit, so the optimizer weighs each move against the maintenance it costs.
It is the soft counterpart of add_ramp_rate(). A ramp
limit forbids fast change outright. A degradation penalty charges for change
and lets the economics decide.
The penalty¶
A penalty is a sum of terms. Each term watches one time-indexed variable \(g\) of the unit, measures a wear driver, subtracts a free deadband \(a\), and charges what remains at a price \(p\). Every term is linear, so a model that was an LP stays an LP.
Kind |
Charged excess \(e[t]\) |
Price is per |
Typical use |
|---|---|---|---|
|
\(\max(0,\ \lvert g[t] - g[t-w]\rvert - a)\) |
unit of change |
pump speed or power cycling, membrane pressure swings, on/off cycling (variation of a status) |
|
\(\max(0,\ \lvert g[t] - g_\text{ref}\rvert - a)\) |
unit held for one hour |
running away from the best efficiency point |
|
\(\max(0,\ g[t] - g_\text{hi}) + \max(0,\ g_\text{lo} - g[t])\) |
unit held for one hour |
flux above critical flux, pressure above nominal |
|
\(\max(0,\ g[t] - a)\) |
unit held for one hour |
processed volume or energy |
A variation is an event: changing by 5 kW costs the same whether the step is 15 minutes or an hour. The other kinds are levels: running 1 bar above nominal for an hour costs four times as much as for 15 minutes. The wear cost rate (in currency per hour) is therefore
A variation term with window \(w > 1\) compares each step with the one
\(w\) steps earlier, so the deadband \(a\) is the free change over
\(w\) steps rather than one. The windows overlap, so a single move falls
in \(w\) of them; dividing by \(w\) charges it once per unit of
change.
Prices are stated directly in currency per unit of the driver (for example dollars per kW of change). That is the number an operator or maintenance contract usually provides. Converting a fraction-of-life model, where a full cycle consumes a known share of a replacement, is a matter of multiplying that share by the replacement cost.
Deadbands, covered cost, and budgets¶
There are three ways to make some wear free or to cap it. They answer different questions.
Per-step deadband (deadband on a term). Each step may move up to
\(a\) for free; only the excess is charged. This is a deadband. It models wear
that is negligible below a threshold (small drive trims, pressure drift
within control noise, battery cycling slower than calendar aging), and it
rewards spreading moves out over time. Inside the deadband many schedules
cost the same, so the solver may return a slightly jittery profile there.
Set the deadband to zero for strict smoothing.
An aggregate floor of the form \(D[t] = \max(\text{cycling}[t], D_\text{shelf})\), used in some battery arbitrage studies, is the same idea: it equals a constant plus a deadband. The constant does not change the optimal schedule and would double count maintenance already carried in the fixed operating cost, so only the deadband is modeled.
Covered cost (covered_cost on the penalty). The first
dollars of wear over the period are free, for example because a service
contract already covers a number of starts per month. Only the total
matters, not when the wear happens:
Horizon budget (horizon_budget on the penalty). A hard cap,
\(C \le B\), with no price attached. Use it for vendor limits such as a
maximum number of motor starts or a warranty cap on pressure cycles. It can
be combined with a price or used alone.
Both horizon values are stated per period_hours (730 for a month) and
prorated to the modeled horizon. Without period_hours they apply to the
modeled horizon as given.
Billing¶
The billable amount is spread evenly over the horizon as the series
<name>_billed_rate and registered on FlexCosting
as the scalar operating cost <unit>_<name>, attributed to the unit. It
appears in the operating cost total and in the cost report next to energy
and fixed costs. Monthly maintenance cost is a reporting conversion of that
total.
Built components¶
For a penalty named wear, term k builds wear_k_quantity (the
watched quantity), wear_k_excess (the hinge), the constraints
wear_k_up/wear_k_down, and mutable parameters wear_k_price,
wear_k_deadband, and the reference or bounds. The penalty builds
wear_rate, wear_total, wear_billable, and, if a budget is given,
wear_budget. Every parameter is registered, so
unit.update_parameters({"wear_0_price": 3.0}) retunes a built model in
place.
Richer wear relationships¶
wear_k_quantity_relation (the quantity equals the variable) and
wear_rate_relation (the rate equals the priced sum) are registered
relations, so swap_relation()
can replace either with a fitted surrogate without rebuilding anything. Two
examples:
Off best efficiency point, variable speed. The best efficiency flow scales with speed, \(Q_\text{bep} = Q_r\,\omega/\omega_r\). Swap the quantity to \(Q - Q_r\,\omega/\omega_r\) and use a
deviationterm with reference 0.Depth-of-discharge battery wear. Swap the quantity to a piecewise fit of the damage curve \(\psi(s)\) and use a
variationterm. The penalty then charges \(\lvert\psi(s_t) - \psi(s_{t-1})\rvert\). This approximates cycle-depth damage: it matches a rainflow count only for cycles that start at the state of charge \(\psi\) is measured from. It is also no longer convex, so the model becomes a MILP or a nonconvex NLP.
Caveats¶
Tightness. Each hinge is an inequality. It equals the true excess only while a price or a budget pushes it down. A penalty that is neither billed nor budgeted logs a warning, because its values would be loose. Wear below
covered_costis free, sowear_rateandwear_totalare loose there too; read the billed cost, or recompute the excess from the solved variables, when reporting wear.The first step. A variation term has no history before the horizon, so steps \(t < w\) carry no charge, and the optimizer may place a large move there. The watched quantity is registered as rolling state so a rolling-horizon driver can carry the last values into the next window.
Scaling. Keep prices so a horizon’s wear cost is of the same order as its other costs; tiny coefficients make poorly scaled rows for interior-point solvers.
Example¶
In Python:
from flexcore.config.schema import DegradationSpec, DegradationTerm, DegradationTermSpec
from flexops.logic import add_degradation
spec = DegradationSpec(
name="membrane_wear",
terms=[
DegradationTermSpec(
kind=DegradationTerm.VARIATION,
variable="outlet_state.pressure",
price=40.0, # dollars per bar of change
deadband=0.2, # bar per step that is free
),
DegradationTermSpec(
kind=DegradationTerm.EXCEEDANCE,
variable="outlet_state.pressure",
price=15.0, # dollars per bar-hour above nominal
upper=60.0,
),
],
covered_cost=500.0, # dollars per month covered by the service contract
period_hours=730.0,
)
rate, total = add_degradation(m.plant.ro, spec, costing=m.costing)
The same penalty in a spec is a degradation element that names its unit:
{
"kind": "degradation",
"unit": "plant.ro",
"name": "membrane_wear",
"terms": [
{"kind": "variation", "variable": "outlet_state.pressure", "price": 40.0, "deadband": 0.2},
{"kind": "exceedance", "variable": "outlet_state.pressure", "price": 15.0, "upper": 60.0}
],
"covered_cost": 500.0,
"period_hours": 730.0
}
costing_package defaults to "auto", the model’s only costing element; set it
to null to leave the wear unbilled.
Values are in the variable’s own units (the example assumes pressure is declared in bar), and prices are in the model currency.